Goodiee
0
0
MarketplaceCreatorsLearnAbout
OverviewCoursesLibraryPlatformArticlesCalculators
BUYSUPPLYCREATEMAKE
Join Goodiee

Marketplace

  • Explore goodies
  • Creators
  • Favorites
  • Goodie Bag

Get started

  • Become a Supplier
  • Become a Creator
  • Become a Maker
  • Create account

Learn

  • Overview
  • Courses
  • Library
  • Platform guides
  • Articles
  • Calculators

Company

  • About
  • Founder
  • Contact
  • How it works

Legal center

  • Terms of Service
  • Privacy policy
  • All policies

Stay in the Loop

Be the first to know when Goodiee launches. Get updates on new creators, marketplace features, production opportunities, and what's coming next.

© 2026 Goodiee LLC. All rights reserved.

  1. Learn
  2. Platform guides
  3. Maker Operations manual: equipment, capacity, and availability

Documentation

  • File types
  • Production
  • Materials
  • Machines
  • Software
  • Products
  • Process
  • Tools
  • Platform guides
    • Start here
    • For creators
    • For makers
    • For suppliers
    • For buyers
    • Profiles, Learn & badges
  • Articles
  • Calculators
Creator pathMaker path
Jump to section
  • Before you start
  • Step by step
  • A useful maintenance routine
  • Related guides
  • Cite this guide

For makers

Maker Operations manual: equipment, capacity, and availability

Configure your maker contact, capabilities, machines, capacity, fulfillment, weekly schedule, and compatible gig handling.

3 min read

By GoodieePublished by Goodiee·Published October 18, 2026
Cite article

Maker guide · Updated Oct 18, 2026

Before you start

  • Approved maker access for production work.
  • Current machine, material, product, capacity, address, and schedule information.

What you will be able to do

  • Keep the capability and capacity inputs used for matching accurate.
  • Pause new gigs intentionally without confusing it with existing commitments.
  • Check save results and review actual offers.

Open the maker workspace's Operations page for the consolidated settings. Older equipment or schedule settings routes can redirect into the current workspace. Use the current Operations section bar rather than relying on old screenshots of separate settings pages.

Step by step

  1. 1

    Step 1: Open Maker Operations

    Open your maker dashboard and choose Operations. Confirm that this is your production profile and that your application is approved for work. The page groups contact, capabilities, equipment, capacity, fulfillment, availability, and gig selection.

    Open this screen →

    Check: The Operations editor is available for your maker account.

  2. 2

    Step 2: Confirm Contact and Address

    Update the production contact's name, email, and phone if supplied. Check the business address, city, state, and ZIP Code used for your operation. An Operations contact-email change does not change your login email.

    Check: Production communication and location information are current.

  3. 3

    Step 3: Review Methods, Materials, and Products

    Select only the methods you can reliably operate, the supported materials you can process, and products you can manufacture. If a method is removed or added, recheck the dependent selections and machine records rather than leaving inconsistent capabilities.

    Check: The selected capabilities agree with one another and your actual workshop.

  4. 4

    Step 4: Register identifiable Equipment

    Register at least one machine for every selected method using its real manufacturer and model, or the supported custom entry. Keep quantities and machine identity accurate. Review machine-specific verification instructions when present; having a capability label is not the same as a verified physical machine.

    Check: Each intended method has the appropriate actual equipment and status.

  5. 5

    Step 5: Set sustainable Production capacity

    Choose weekly production hours, typical lead time, and job-size preferences from the form. Allow time for setup, inspection, finishing, packing, maintenance, and other commitments. Do not count the same work hours as independent capacity for every machine you own.

    Check: The declared capacity can be supported by the people, equipment, and time available.

  6. 6

    Step 6: Set Fulfillment

    Choose the handoff options, packaging, and related fulfillment answers that match your real operation. Review the constraints and delivery expectations before selecting an option; availability of local handoff does not guarantee that every order can be delivered the same day.

    Check: The offered fulfillment methods are operationally possible.

  7. 7

    Step 7: Handle equipment Verification when shown

    Use the verification area and the equipment workflow to provide the evidence or challenge response requested for the actual machine. Wait for the recorded review outcome; do not label a new machine verified because a different machine was approved.

    Check: Verification corresponds to the intended equipment or production method.

  8. 8

    Step 8: Set Production availability

    Use the weekly day/time editor to set when production can take place. Check each active day's Starts and Ends entries. Under Are you accepting new gigs?, choose Accepting new gigs or Pause new gigs. Pausing new offers does not cancel work you already accepted.

    Check: Your weekly windows and new-gig availability both match your current situation.

  9. 9

    Step 9: Choose Gig selection behavior

    Review every gig leaves compatible offers for you to accept. Review gigs within capacity filters out work beyond the configured schedule/capacity and still requires you to review the rest. Do not describe either choice as guaranteed work or as a fully automatic accept mode.

    Check: The selected behavior matches how you intend to handle offers.

  10. 10

    Step 10: Save, then inspect Gigs

    Choose Save changes, wait for the saved result, and fix any errors. Open Gigs to review actual matched offers. An empty queue can be legitimate; offers also depend on paid demand, job requirements, approval, machine status, materials, and current capacity.

    Open this screen →

    Check: Settings are saved and offer availability is interpreted without assuming a promised workload.

A useful maintenance routine

  • Before accepting work: check materials, machine condition, schedule, quantity, and ship-by date.
  • After equipment or staffing changes: revise capabilities and capacity, then verify saved values.
  • Before time off: pause new gigs if appropriate and address existing accepted work separately.
  • After shipping: record the required shipment update and tracking details in the assigned job.

Related guides

  • Maker application →
  • Order fulfillment →

Reference this resource

Cite this guide

Use the reference below, or import a file into your reference manager to apply your required citation style.

Goodiee. (October 18, 2026). Maker Operations manual: equipment, capacity, and availability. https://goodiee.com/learn/set-up-maker-operations

Article URL: https://goodiee.com/learn/set-up-maker-operations

Download BibTeXDownload RISDownload CSL JSON

Related guides

  • RolesPlatform guide

    For makers

    Maker guide: apply, verify, and prepare for gigs

    Create your account, submit a maker application, register equipment, set production capacity, and understand matched gigs.

    3 min read

    By Goodiee

    Published Oct 18, 2026

    Read guide →Cite guide
  • RolesPlatform guide

    For makers

    Maker application manual: prepare, submit, and track approval

    Complete every maker application section, register equipment, provide finished-work evidence, and understand the review outcome.

    4 min read

    By Goodiee

    Published Oct 18, 2026

    Read guide →Cite guide
  • RolesPlatform guide

    For makers

    Setting up a maker workshop

    Equipment, workspace, and operational fundamentals for makers who want to produce routed jobs through the Goodiee network.

    2 min read

    By Goodiee

    Published May 25, 2026

    Read guide →Cite guide
  • ProductionPlatform guide

    For makers

    Standard work for one custom order: a maker SOP

    A practical SOP for fulfilling a single routed job: intake, file verification, material pull, production, QC, pack, and handoff without skipping the steps that cause remakes.

    4 min read

    By Goodiee

    Published May 27, 2026

    Read guide →Cite guide

Comments

Loading comments...

Log in to post, reply, mark contributions as helpful, or report a concern.

← All platform guides

On this page

  • Before you start
  • Step by step
  • A useful maintenance routine
  • Related guides
  • Cite this guide